Apartments under construction in the Demirtaş area. Installment payment when buying.
Apartment’s layout and infrastructure in a residential complex.
The company “Zera Homes” offers you apartments in a complex under construction in the Demirtaş area. The completion of the construction of the complex is scheduled for March 2025. The complex will consist of 2 blocks. Each block has 9 floors. There are 144 apartments in the complex: 1+1 (128 apartments) and 2+1 (16 apartments). The area of the apartments is from 46 m2 to 113 m2. The apartments will be equipped with aluminum profiles on the windows, a coating on the floor-ceramic granite of the 1st class with a size of 60/120. The walls will be constructed of 25 cm blocks (eco-pumice blocks). The bathrooms will have underfloor heating and are fully equipped with sinks, toilets, showers, and lockers. The kitchen will also be equipped with a headset with provided compartments for household appliances. The complex will have its own infrastructure: an outdoor swimming pool, including a children’s pool, a sauna, massage rooms, a fitness room, a barbecue area, and a tennis court.