Art.676-679
Çiplaklı (above the Oba area)
We present you our new hotel concept project, which embodies modernity, quality of construction and style.
The total area of the plot is 9056 m2.
The open infrastructure area is 7250 m2.
Open infrastructure of the complex:
• Outdoor adult pool between blocks A and B – 140 m2
• Outdoor adult pool between blocks D – 200 m2
• Children’s outdoor pool
• Bar under an awning by the pool
• Gazebo for relaxation and barbecue
• Children’s playground with rubber coating
• Tennis court / Basketball court
• Parking at each block
• Garden with ornamental trees
• Power generator in case of an emergency power outage
Along the perimeter, the territory of the complex will be fenced and guarded 24/7.
Internal infrastructure:
• Gym
• SPA-complex:
Sauna
Hamam
Steam room – 2
Jacuzzi
Rest zone
• Children’s playroom
• Coworking
• Pilates and yoga room
• Game room (tennis, billiards)
• Storage room
• Management company office
The residential complex will consist of 4 seven-storey blocks. Total 175 apartments:
• 1+1 (61.5 m2 – 68 m2) – from 116,000 euros
• 2+1 (94m2 – 95 m2) – from 175,000 euros
• 2+1 Duplex – penthouse (115m2 – 136 m2) – 224,000 euros
• 3+1 Duplex – penthouse (182m2 – 191 m2) – 277,000 euros
Characteristics of the apartments:
• Laminate in the bedrooms (optional)
• Flooring in all other rooms – porcelain stoneware
• Built-in spot lighting
• Kitchen set with LED-backlight
• Fully equipped bathrooms
• Intercom
• Windows with double glazing and metal profile
• Steel front door
• Wooden interlocking doors
The main concept of the complex is a multi-tonal composition with its own stylistic features that distinguish each block. Therefore, we named each of the blocks after the best world composers:
A block – Tchaikovsky
B block – Beethoven
C block – Vivaldi
D block – Mozart
The complex itself is located on top of a hill. Around the complex there is a park area and nothing will block the view from the window.
For the entire construction period there is an interest-free installment plan with a down payment of 30%.
The start of construction is December 2022.
TAPU for apartments will be ready in March 2023.
Completion of construction – December 2024.