LAND STATUS: “RESIDENTIAL PROPERTY + TOURIST AREA”.
BUILDING PERMIT: 20% OF THE PLOT AREA.
ACCORDING TO THE PROJECT, A HOTEL, A MARINA FOR 600-700 YACHTS AND TOWING SPACES WILL BE BUILT…
THE ORIGINAL AREA OF THE PLOT IS 890 THOUSAND SQUARE METERS,
AFTER THE LAND IS TRANSFERRED TO THE REQUIRED STATUS, THE AREA OF 700 THOUSAND SQUARE METERS WILL BE LEFT.