This have not happened before! A grandiose complex on the first line!
In the
center of Mahmutlar
, on the first line, the construction of a grandiose premium-class residential complex has started from one of the oldest and most reliable developers in the region.
On a land plot with a total area of 10.000 sq.m. 3 modern 11-storey residential blocks will be built, the lower floors of which will be occupied by commercial premises, and the upper – luxury penthouses.
In total, the residential complex will feature 337 apartments of various sizes and layouts: from cozy 1 + 1 apartments with an area of 57-60 sq.m. to royal penthouses 4+1 with a total area of 250 sq.m.
Hurry up to choose your apartment while you still have such an opportunity.
The complex will have a rich internal infrastructure of the level of a 5 * hotel. Here, according to the project, there will be:
• Outdoor swimming pool with water slides;
• Tennis court and paddle court;
• Basketball playground;
• VIP area by the outdoor pool;
• Gazebos and barbecue areas;
• Large playground;
• Outdoor parking for cars;
• Cafe, bar;
• Standby generator;
• Covered car parking;
• Indoor heated pool with water slides;
• Steam room, sauna, hammam;
• Recreation areas and massage rooms;
• VIP room and salt room;
• Equipped gym;
• Games room (billiards, table tennis);
• TV room;
• Business room (room for business meetings, presentations, etc.);
• Guest apartments (with the possibility of reservation by the residents of the complex for their guests);
• Lobby, reception;
• Security and video surveillance system;
• Moving around the complex on a golf cart;
• Private equipped beach.
ATTENTION!
Only until the end of construction, you have the opportunity to fix the price and take advantage of an interest-free installment plan from the developer. Only
until 31.03.2022
when buying or booking any apartments in this project, you will receive a
BONUS from FİESTA HOMES
– a set of kitchen built-in appliances of the BEKO brand.
The cost of apartments – from 125.000 €
Start of construction – December 2021
The planned completion date of the project is the 2nd quarter of 2023
The object number on our website is
Apt-373
For detailed information or an online presentation, please contact us!