Sign In

Sale Starts from €1,000,000.00

Land plot in Bodrum, Mugla, Turkey

Bodrum
Object ID: 7349821
  • Studio
    Rooms
  • 3500 m² sq ft

Description

Property type: Land Location: one of the most popular tourist areas of the Bodrum peninsula, 200 meters from the sea and the blue-flag beach, the distance to the historical center of Bodrum is 10 km, the distance to the international airport is 35 km. For sale are offered 3 plots of land located next to each other. It is possible to purchase both individually and collectively. The total area of ​​each land: 3 500 m2. Permission for construction: 15/30% (1050m2). All communications are summed up. The cost of each site is 1 000 000 euros. Calculations for the project: With the purchase of one plot of land, the investor can build 7 villas of 150 m2 of residential and 200 m2 of total area, the area of ​​each villa will be about 500 m2. Construction costs – 525 000 euros (at the rate of 500 euros / m2). Expenses for upgrading the territory of the complex: fencing territory, walking paths, landscaping and landscaping – 70 000 euros. The cost of retailing villas – from 500 000 euros (is the actual market value of villas of similar size at a given distance from the sea on the Bodrum peninsula).

The total cost of the project is 1 595 000 euros (cost of construction and land plot). The income from the project is 3 500 000 euros. The profit from the project is 1,905,000 euros (almost 120%). When purchasing all three plots, the investor can build either 21 villas according to the same scheme, or a small hotel + villas or apartments on the territory. Terms of implementation: Obtaining permission for construction and approval of the project – from 2 weeks to 3 months. Construction of residential facilities – from 4 to 12 months (construction season in Bodrum lasts from September to May (this includes only the erection of load-bearing structures, the work on interior decoration of the premises is allowed year-round)). Realization of residential objects (sale in retail in full) – can begin to be carried out from the moment of approval of the building plan. On average, the full implementation of objects is achieved in a period of 6 months to 1.5 years.
Verified Listing

Booking

Have a coupon?
This coupon was added
Login to Book

Message Vendor

    Preferred contact method